Being involved early on in a project is not always the natural course of events, although when it does happen there can be significant benefits that can be gained.

Project Description
Thanks to early manufacturer engagement on this project a number of optimised design efficiencies
were achieved which resulted in significant cost reductions.

Through an established relationship the developer was able to work with the manufacturer from the
early design and concept stages.

Working together they were able to use their combined knowledge and experience from the lessons
learned from previous phases to achieve optimum efficiency on materials and manufacture.

This alliance meant that the optimised sizes and scale could be implemented in the final layouts with
the architect allowing for more efficient installations and more competitive pricing, without loss of
margins.

Valued added
Thanks to this collaboration additional cost optimisation were also achieved when a number of unit
and accommodation types were